Last Name :  
Member ID :  
Password :
  You are logged in as Guest Home Advanced Search Feedback-Contact Us My Journal/Searches Tech Support Help
  INFORMS Homepage
  Editor-in-Chief Homepage
  Society link
  PubsOnLine - Library Access
  INFORMS Publications
  Copyright and Permissions
   
  Journals
Decision Analysis
Information Systems Research
INFORMS Journal on Computing
Interfaces
Management Science
Manufacturing and Service Operations Management
Marketing Science
Mathematics of Operations Research
Operations Research
Organization Science
Transportation Science
International Abstracts in Operations Research
  Electronic Journal
INFORMS Transactions on Education
  Membership Magazines
OR/MS Today
OR/MS Tomorrow
  Request for Subscription
   




 
 
 
 

INFORMS Journal on Computing
 
     
  Volume Number 20   Issue Number 1   First Page 21   Last Page 33   Cover Date February 01, 2008

 
 
 
Email to a friend

Add to Favorites

Full Text

Abstract PDF
 
 
     
  The Integrated Production and Transportation Scheduling Problem for a Product with a Short Lifespan
H. Neil Geismar, Gilbert Laporte, Lei Lei, Chelliah Sriskandarajah
 
  The integrated production and transportation scheduling problem (PTSP) with capacity constraints is common in many industries. An optimal solution to PTSP requires one to simultaneously solve the production scheduling and the transportation routing problems, which requires excessive computational time, even for relatively small problems. In this study, we consider a variation of PTSP that involves a short shelf life product; hence, there is no inventory of the product in process. Once a lot of the product is produced, it must be transported with nonnegligible transportation time directly to various customer sites within its limited lifespan. The objective is to determine the minimum time required to complete producing and delivering the product to meet the demand of a given set of customers over a wide geographic region. This problem is NP-hard in the strong sense. We analyze the properties of this problem, develop lower bounds on the optimal solution, and propose a two-phase heuristic based on the analysis. The first phase uses either a genetic or a memetic algorithm to select a locally optimal permutation of the given set of customers; the second phase partitions the customer sequence and then uses the Gilmore-Gomory algorithm to order the subsequences of customers to form the integrated schedule. Empirical observations on the performance of this heuristic are reported.  
   
  Quick Search
   
   
   
     
  Featured Sites
 
 
Copyright © Informs 2008. All rights reserved.