Assembly Routing Problem - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	d_t	tot_time	sln_val	
15	114	4	2	14	6	1	2520	180	670	67000	15	23.64	343647	
p_t	x_ijt	q_it	and_so_on
16.01	0	0	13	21	3	6	4	46	5	90	6	54.111	11	44	1	16	2	14	14	96	9	23	7	16	8	20	12	12	10	16	0	0	-1
0.01	-1
30.01	0	0	3	12	6	21.888	11	22.5	1	30	9	92	7	60	8	60	2	7	12	30	13	42	10	30	0	0	-1
0.01	-1
15.01	0	0	4	30	3	15	11	43.5	1	30	2	13	12	15	13	42	10	15	0	0	-1
15.01	0	0	3	15	12	15	2	15	14	24	8	20	10	15	0	0	-1