Assembly Routing Problem - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	d_t	tot_time	sln_val	
15	118	3	2	14	6	1	1610	156	520	52000	13	25.29	317670	
p_t	x_ijt	q_it	and_so_on
19.01	0	0	8	19	3	19	6	57	13	19	11	18	9	19	14	25.125	7	68	5	19	4	19	2	19	1	22	10	19	12	19	0	0	-1
0.01	0	0	10	66	0	0	-1
13.01	0	0	12	26	1	44	4	26	2	32	5	26	9	26	14	19.875	13	26	11	26	3	26	8	13	0	0	-1
13.01	0	0	8	23	0	0	-1
13.01	0	0	8	11	3	30	6	38	14	13	13	13	11	13	9	26	5	13	4	26	2	34	1	44	12	26	0	0	-1
13.01	0	0	7	17	5	13	14	13	13	13	11	13	8	5	0	0	-1