set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	d_t	tot_time	sln_val	
15	120	5	2	14	6	1	1440	156	630	63000	13	29.58	254572	
p_t	x_ijt	q_it	and_so_on
0.01	0	0	12	11	4	75	5	12	13	57	11	32	7	49	0	0	-1
23.01	0	0	6	44	10	23	2	36	8	23	1	26	3	32	14	38	9	47	0	0	-1
0.01	-1
26.01	0	0	12	26	5	23	13	3	11	17	6	22	10	39	2	18	8	26	1	23	3	17	14	19	9	7.571	0	0	-1
0.01	0	0	9	30.428	14	38	3	31	1	16	8	13	2	48.25	6	44	11	31	7	13	0	0	-1
13.01	0	0	12	13	5	13	13	105	0	0	-1