set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	d_t	tot_time	sln_val	
15	13	3	2	14	6	1	1610	156	1440	144000	13	29.79	712934	
p_t	x_ijt	q_it	and_so_on
15.01	0	0	8	15	3	15	6	64.111	13	15	11	15	9	15	14	15	7	17	5	15	4	15	2	17	1	22	10	17	12	41	0	0	-1
0.01	-1
26.01	0	0	10	68	7	34	2	34	1	44	4	26	5	26	9	26	11	26	13	41	14	26	6	37.666	3	30	8	26	0	0	-1
0.01	-1
13.01	0	0	12	13	1	22	2	17	4	26	5	13	7	17	14	13	9	26	11	13	3	30	8	13	0	0	-1
13.01	0	0	12	13	1	22	2	17	5	13	7	17	14	13	13	11	11	13	8	13	0	0	-1