Assembly Routing Problem - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	d_t	tot_time	sln_val	
15	174	4	2	14	6	1	2520	180	520	52000	15	18.94	208469	
p_t	x_ijt	q_it	and_so_on
0.01	-1
17.01	0	0	13	84	3	12	4	57.75	5	36	6	62	11	44	1	17	2	14	14	120	9	46	7	75	8	40	12	18	10	28	0	0	-1
0.01	-1
30.01	0	0	10	28	8	60	9	69	1	45	11	66	2	21	12	29	3	21	5	36	4	7.25	0	0	-1
0.01	-1
15.01	0	0	5	18	3	15	2	14	12	15	13	21	10	14	0	0	-1