set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	d_t	tot_time	sln_val	
15	213	3	2	14	6	1	3220	156	560	56000	13	17.81	162951	
p_t	x_ijt	q_it	and_so_on
0.01	0	0	12	65	0	0	-1
33.01	0	0	10	51	7	51	2	51	1	66	4	33	5	33	9	33	11	33	13	33	14	33	6	63.444	3	45	8	33	0	0	-1
0.01	-1
0.01	-1
26.01	0	0	10	34	7	102	2	34	1	44	4	26	5	30	9	26	11	26	13	37	14	30	6	31.555	3	45	8	33	0	0	-1
0.01	-1