Assembly Routing Problem - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	d_t	tot_time	sln_val	
15	214	4	2	14	6	1	3360	180	580	58000	15	18.36	236339	
p_t	x_ijt	q_it	and_so_on
0.01	0	0	10	28	0	0	-1
22.01	0	0	13	105	12	22	8	40	7	75	9	115	14	168	2	14	1	22	11	44	6	66	3	12	5	36	4	52	0	0	-1
0.01	-1
30.01	0	0	3	21	5	54	6	1	11	66	1	45	2	20	14	0	8	60	12	30	13	0	10	28	0	0	-1
0.01	-1
15.01	0	0	10	14	12	15	2	15	3	15	4	15	0	0	-1