Assembly Routing Problem - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	d_t	tot_time	sln_val	
15	267	2	2	14	6	1	1610	168	1760	176000	14	30.57	932074	
p_t	x_ijt	q_it	and_so_on
16.01	0	0	4	16	11	16	14	58	2	7	3	5	5	21	10	19	6	44	12	51	1	16	9	16	13	16	8	16	7	16	0	0	-1
0.01	0	0	7	49.333	8	50	13	28	9	28	0	0	-1
28.01	0	0	1	64	10	38	5	84	3	17	2	35	4	28	11	28	0	0	-1
0.01	-1
14.01	0	0	4	14	11	28	7	34.666	8	44	13	28	9	28	12	34	6	28	10	38	3	14	2	4	0	0	-1
14.01	0	0	14	14	3	14	2	14	4	14	0	0	-1