Assembly Routing Problem - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	d_t	tot_time	sln_val	
15	280	5	2	14	6	1	2160	156	570	57000	13	19.57	334990	
p_t	x_ijt	q_it	and_so_on
18.01	0	0	12	24	4	75	5	6	13	45	11	80	7	44	6	65	10	18	2	18	8	18	1	18	3	18	14	19	9	85	0	0	-1
0.01	-1
26.01	0	0	5	24	6	45	10	52	2	72	8	26	1	26	3	30	14	38	0	0	-1
0.01	-1
13.01	0	0	12	13	5	5	13	30	7	26	8	13	1	26	3	32	14	38	0	0	-1
13.01	0	0	12	13	5	13	8	13	0	0	-1