Assembly Routing Problem - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	d_t	tot_time	sln_val	
15	294	4	2	14	6	1	2520	180	570	57000	15	22.79	340516	
p_t	x_ijt	q_it	and_so_on
18.01	0	0	13	105	3	18	4	63	5	18	6	18	11	44	1	18	2	7	14	72	9	115	7	18	8	20	12	12	10	18	0	0	-1
0.01	-1
30.01	0	0	5	72	6	45	11	44	1	45	2	14	12	30	8	40	7	60	10	30	0	0	-1
0.01	-1
15.01	0	0	3	15	12	15	2	13	14	48	8	40	10	30	0	0	-1
15.01	0	0	4	15	3	15	6	15	11	22	1	15	2	15	12	15	0	0	-1