Assembly Routing Problem - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	d_t	tot_time	sln_val	
15	312	2	2	14	6	1	1610	168	2170	217000	14	32.85	1.19512e+06	
p_t	x_ijt	q_it	and_so_on
22.01	0	0	4	16	11	23.888	7	22	8	22	13	22	9	22	1	22	12	51	6	22	10	22	5	22	2	4	14	22	0	0	-1
0.01	0	0	14	42	2	32	3	22	5	62	10	35	6	34	1	33.375	0	0	-1
28.01	0	0	4	28	11	28.111	7	45	8	44	13	56	9	28	1	24.625	0	0	-1
0.01	-1
14.01	0	0	4	14	11	26	7	33	8	44	9	28	12	34	6	22	10	38	3	14	2	10	14	0	0	0	-1
14.01	0	0	4	14	14	14	3	14	5	21	2	14	0	0	-1