Assembly Routing Problem - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	d_t	tot_time	sln_val	
15	335	5	2	14	6	1	2880	156	770	77000	13	18.73	482374	
p_t	x_ijt	q_it	and_so_on
16.01	0	0	12	24	4	75	5	6	13	75	11	80	7	60	6	66	10	53.222	2	18	8	16	1	16	3	80	14	57	9	85	0	0	-1
0.01	-1
26.01	0	0	5	16	6	44	10	14.777	2	72	8	26	1	26	0	0	-1
0.01	-1
13.01	0	0	14	38	1	26	8	13	5	20	12	21	0	0	-1
13.01	0	0	12	5	5	6	7	60	8	13	0	0	-1