Assembly Routing Problem - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	d_t	tot_time	sln_val	
15	33	3	2	14	6	1	3220	156	560	56000	13	18.27	215533	
p_t	x_ijt	q_it	and_so_on
0.01	0	0	12	39	0	0	-1
21.01	0	0	10	85	7	85	2	51	1	66	4	34	5	34	9	34	11	34	13	34	14	34	6	57	3	45	8	22	0	0	-1
0.01	-1
13.01	0	0	8	33	0	0	-1
26.01	0	0	8	5	3	45	6	38	14	29	13	36	11	26	9	26	5	26	4	26	2	119	1	44	12	26	0	0	-1
0.01	-1