Assembly Routing Problem - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	d_t	tot_time	sln_val	
15	353	3	2	14	6	1	2410	156	590	59000	13	17.01	227601	
p_t	x_ijt	q_it	and_so_on
0.01	0	0	12	78	0	0	-1
15.01	0	0	10	102	7	85	2	34	1	44	4	22	5	18	9	16	11	15	13	15	14	18	6	114	3	30	8	22	0	0	-1
0.01	-1
39.01	0	0	1	66	2	51	4	33	5	36	9	38	14	36	13	39	11	39	3	45	8	33	0	0	-1
0.01	-1
0.01	-1