Assembly Routing Problem - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	d_t	tot_time	sln_val	
15	360	5	2	14	6	1	1440	156	530	53000	13	43.15	396131	
p_t	x_ijt	q_it	and_so_on
16.01	0	0	12	24	4	24.8	13	16	11	16	7	16	6	16	10	16	2	16	8	16	1	20.625	3	16	14	19	9	17	0	0	-1
0.01	0	0	4	20.2	5	22	13	29	11	32	6	53.888	10	26	2	38	0	0	-1
26.01	0	0	9	68	14	38	3	32	1	31.375	8	26	7	39	0	0	-1
0.01	-1
13.01	0	0	12	13	4	15	5	13	13	15.375	11	16	6	40.111	10	26	2	36	8	13	1	3	3	16	14	19	0	0	-1
13.01	0	0	12	13	4	15	5	13	13	14.625	11	16	7	13	8	13	1	13	3	16	14	19	0	0	-1