Assembly Routing Problem - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	d_t	tot_time	sln_val	
15	390	5	2	14	6	1	1440	156	980	98000	13	37.98	472937	
p_t	x_ijt	q_it	and_so_on
17.01	0	0	12	5	4	17	5	6	13	17	11	17	7	17	6	22	10	17	2	17	8	17	1	17	3	17	14	17	9	17	0	0	-1
0.01	0	0	14	6.5	3	31	8	0	2	37	7	26	0	0	-1
26.01	0	0	12	19	4	28	5	16	13	28	11	31	6	44	10	26	8	26	1	26	14	33.5	9	34	0	0	-1
0.01	-1
13.01	0	0	12	13	4	15	5	13	13	15	11	16	7	26	6	22	10	13	2	18	8	13	1	13	3	16	14	19	9	17	0	0	-1
13.01	0	0	12	13	4	15	5	13	13	15	11	16	6	22	10	13	2	18	8	13	1	13	3	16	14	19	9	17	0	0	-1