Assembly Routing Problem - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	d_t	tot_time	sln_val	
15	396	1	2	14	6	1	2410	192	2040	204000	16	29.36	980255	
p_t	x_ijt	q_it	and_so_on
0.01	-1
20.01	0	0	7	22	10	22	3	30	11	38	9	38	13	38	8	26	4	14	12	42	6	32	2	30	5	26	1	20	14	38	0	0	-1
0.01	0	0	7	22	10	22	0	0	-1
16.01	0	0	7	22	10	22	3	15	11	57	9	38	13	38	8	26	4	19	12	42	6	32	2	30	5	42	1	16	14	19	0	0	-1
16.01	0	0	3	30	10	22	7	22	1	16	14	38	0	0	-1
16.01	0	0	7	22	10	22	9	19	13	19	8	16	4	16	12	21	6	16	2	15	1	16	0	0	-1