Assembly Routing Problem - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	d_t	tot_time	sln_val	
15	399	4	2	14	6	1	2520	180	1520	152000	15	27.01	741051	
p_t	x_ijt	q_it	and_so_on
0.01	-1
30.01	0	0	13	42	3	18	4	30	5	36	6	30	11	44	1	30	2	14	14	48	9	69	7	45	8	60	12	27	10	30	0	0	-1
0.01	-1
15.01	0	0	10	15	13	21	12	15	14	48	2	20	1	15	11	22	6	45	5	36	4	15	0	0	-1
15.01	0	0	4	15	3	15	11	44	1	30	9	46	7	30	8	40	12	15	13	21	10	15	0	0	-1
15.01	0	0	10	15	13	21	12	15	14	24	2	15	3	15	5	18	4	15	0	0	-1