Assembly Routing Problem - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	d_t	tot_time	sln_val	
15	442	2	2	14	6	1	2410	168	1900	190000	14	34.81	915375	
p_t	x_ijt	q_it	and_so_on
18.01	0	0	4	16	11	18	14	18	2	6	3	5	5	21	10	19	6	18	12	18	1	20.444	9	18	13	18	8	22	7	20	0	0	-1
0.01	-1
28.01	0	0	4	28	11	28	14	28	2	26	3	17	5	42	10	38	6	28	12	33	1	27.555	9	28	13	28	8	44	7	40	0	0	-1
0.01	-1
14.01	0	0	4	14	11	28	14	14	2	14	3	14	5	21	10	19	6	14	12	17	1	16	9	28	13	28	8	44	7	40	0	0	-1
14.01	0	0	4	14	14	14	2	14	3	14	5	21	10	19	6	14	12	17	1	16	0	0	-1