Assembly Routing Problem - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	d_t	tot_time	sln_val	
15	476	1	2	14	6	1	1610	192	1250	125000	16	15.46	878546	
p_t	x_ijt	q_it	and_so_on
8.01	0	0	7	8	10	8	3	8	11	40	9	8	13	8	8	24	4	7	12	24	6	24	2	24	5	24	1	10	14	24	0	0	-1
16.01	0	0	7	16	9	18.875	13	16	10	36	3	32	0	0	-1
16.01	0	0	14	33	1	28	5	32	2	32	6	32	12	39	4	14	8	16	13	16	9	13.125	7	20	0	0	-1
16.01	0	0	7	22	9	36	13	17	8	21.25	11	55	3	48	10	22	0	0	-1
16.01	0	0	7	22	10	22	13	19	8	10.75	4	12	12	42	6	32	2	32	5	32	1	16	14	38	0	0	-1
16.01	0	0	7	22	10	22	9	19	13	19	8	16	4	16	1	16	0	0	-1