Assembly Routing Problem - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	d_t	tot_time	sln_val	
15	4	4	2	14	6	1	3360	180	2540	254000	15	24.33	1.53782e+06	
p_t	x_ijt	q_it	and_so_on
27.01	0	0	13	27	3	6	4	27	5	27	6	42	11	44	1	42	2	7	14	27	9	27	7	27	8	27	12	27	10	27	0	0	-1
0.01	-1
15.01	0	0	4	15	5	15	3	12	2	7	14	21	9	42	7	30	8	33	13	15	10	15	0	0	-1
15.01	0	0	10	15	13	21	12	15	14	24	2	7	1	30	11	44	6	30	5	30	4	15	0	0	-1
15.01	0	0	4	15	3	15	12	15	2	13	14	24	9	46	7	30	8	40	13	21	10	15	0	0	-1
15.01	0	0	4	15	5	18	3	15	6	15	11	22	1	15	2	15	14	24	12	15	13	21	10	15	0	0	-1