set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	d_t	tot_time	sln_val	
15	97	2	2	14	6	1	2410	168	680	68000	14	13.16	418225	
p_t	x_ijt	q_it	and_so_on
26.01	0	0	4	25.666	11	26	14	26	2	6	3	5	5	26	10	26	6	40	12	85	1	40	9	40	13	40	8	44	7	100	0	0	-1
0.01	-1
14.01	0	0	10	14	5	79	3	5	2	12	14	14	11	26	4	18.333	0	0	-1
14.01	0	0	8	66	13	42	9	42	1	42	6	28	10	36	3	26	2	28	14	42	11	13	0	0	-1
14.01	0	0	4	19	11	13	0	0	-1
14.01	0	0	4	9	11	4	2	14	3	14	10	19	6	14	0	0	-1