Assembly Routing Problem - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	d_t	tot_time	sln_val	
15	99	4	2	14	6	1	2520	180	560	56000	15	26.45	288000	
p_t	x_ijt	q_it	and_so_on
0.01	0	0	10	18.222	0	0	-1
13.01	0	0	13	21	12	12	8	60	7	75	9	69	14	28.444	2	7	1	43	11	66	6	13	3	18	5	18	4	43	0	0	-1
30.01	0	0	5	36	6	60	14	91.555	2	14	12	30	13	63	10	24.777	0	0	-1
0.01	-1
15.01	0	0	10	30	8	40	9	46	1	30	11	44	2	13	12	21	3	15	5	36	4	30	0	0	-1
15.01	0	0	3	15	2	15	12	9	13	21	0	0	-1