Production Routing Problem - Instances From Archettie et al. (2011)
Best Found Solution - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	tot_time	sln_val	
15	17	4	2	14	6	1	252	UL	80	8000	14.65	78798	
p_t	x_ijt	q_it	and_so_on
0.01	-1
570.01	0	0	6	22	11	66	2	21	14	24	8	41	12	27	13	21	10	28	0	0	-1
0.01	0	0	4	26	3	24	5	18	0	0	-1
0.01	0	0	8	59	7	30	9	46	1	8	11	44	2	14	12	9	10	42	0	0	-1
0.01	-1
0.01	-1