Production Routing Problem - Instances From Archettie et al. (2011)
Best Found Solution - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	tot_time	sln_val	
15	18	4	2	14	6	1	168	UL	80	8000	14.63	80671	
p_t	x_ijt	q_it	and_so_on
0.01	-1
570.01	0	0	5	0	6	22	11	66	2	7	14	0	8	59	10	14	0	0	-1
0.01	0	0	4	13	3	24	1	8	2	21	14	24	12	36	13	0	10	42	0	0	-1
0.01	0	0	2	7	11	44	1	0	9	46	7	30	8	41	0	0	-1
0.01	-1
0.01	0	0	5	18	4	13	13	21	10	14	0	0	-1