Production Routing Problem - Instances From Archettie et al. (2011)
Best Found Solution - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	tot_time	sln_val	
15	24	2	2	14	6	1	161	UL	80	8000	11.88	65169	
p_t	x_ijt	q_it	and_so_on
0.01	-1
516.01	0	0	4	27	11	39	7	20	8	44	13	12	10	19	0	0	-1
0.01	0	0	14	14	2	12	3	10	5	21	10	40	1	64	0	0	-1
0.01	0	0	8	66	13	1	9	14	12	34	6	8	10	36	0	0	-1
0.01	0	0	4	9	11	26	0	0	-1
0.01	-1