Production Routing Problem - Instances From Archettie et al. (2011)
Best Found Solution - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	tot_time	sln_val	
15	47	1	2	14	6	1	241	UL	800	80000	13.64	608226	
p_t	x_ijt	q_it	and_so_on
0.01	-1
640.01	0	0	7	22	10	30	3	45	11	38	9	19	8	26	4	14	12	21	6	16	1	10	0	0	-1
0.01	0	0	14	76	1	30	5	52	2	60	0	0	-1
0.01	0	0	3	15	10	14	13	19	8	39	4	21	12	63	1	10	0	0	-1
0.01	-1
0.01	-1