Production Routing Problem - Instances From Archettie et al. (2011)
Best Found Solution - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	tot_time	sln_val	
15	57	1	2	14	6	1	161	UL	30	3000	12.59	66080	
p_t	x_ijt	q_it	and_so_on
0.01	-1
640.01	0	0	3	30	13	19	8	39	4	21	12	22	1	30	0	0	-1
0.01	0	0	2	33	5	52	14	76	0	0	-1
0.01	0	0	1	20	2	27	6	16	12	62	4	14	7	22	0	0	-1
0.01	0	0	10	44	9	19	8	26	11	38	3	30	0	0	-1
0.01	-1