Production Routing Problem - Instances From Archettie et al. (2011)
Best Found Solution - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	tot_time	sln_val	
15	69	5	2	14	6	1	144	UL	30	3000	12.27	108371	
p_t	x_ijt	q_it	and_so_on
0.01	-1
529.01	0	0	14	26	1	26	8	27	2	47	5	18	0	0	-1
0.01	0	0	6	88	10	22	2	25	8	9	0	0	-1
0.01	0	0	14	50	3	16	1	39	9	34	0	0	-1
0.01	0	0	12	10	4	15	5	6	13	15	11	32	7	24	0	0	-1
0.01	-1