Production Routing Problem - Instances From Archettie et al. (2011)
Best Found Solution - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	tot_time	sln_val	
15	71	4	2	14	6	1	252	UL	80	8000	12.7	126162	
p_t	x_ijt	q_it	and_so_on
0.01	-1
570.01	0	0	13	21	12	9	14	24	2	16	11	44	1	8	9	46	7	30	8	40	10	14	0	0	-1
0.01	0	0	4	26	3	24	10	42	0	0	-1
0.01	0	0	4	0	5	18	6	22	11	66	2	19	12	27	8	60	10	14	0	0	-1
0.01	-1
0.01	-1