Production Routing Problem - Instances From Archettie et al. (2011)
Best Found Solution - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	tot_time	sln_val	
15	7	5	2	14	6	1	288	UL	30	3000	15.22	27461	
p_t	x_ijt	q_it	and_so_on
0.01	-1
529.01	0	0	12	10	5	18	13	15	7	24	6	66	2	18	8	27	1	26	3	16	14	57	0	0	-1
0.01	-1
0.01	0	0	4	15	5	6	11	32	6	22	10	22	2	54	8	9	1	39	14	19	9	34	0	0	-1
0.01	-1
0.01	-1