Production Routing Problem - Instances From Archettie et al. (2011)
Best Found Solution - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	tot_time	sln_val	
15	86	1	2	14	6	1	241	UL	300	30000	11.38	226890	
p_t	x_ijt	q_it	and_so_on
0.01	-1
640.01	0	0	3	34	11	38	8	39	4	21	12	63	6	16	1	30	0	0	-1
0.01	0	0	3	26	7	22	2	60	5	52	14	76	0	0	-1
0.01	0	0	10	44	9	19	13	19	8	26	4	14	12	21	1	20	0	0	-1
0.01	-1
0.01	-1