Production Routing Problem - Instances From Archettie et al. (2011)
Best Found Solution - CIRRELT, GERAD & HEC Montreal, QC Canada
set	ins_id	class	trans_cost	n	l	m	Q	C	u	f	tot_time	sln_val	
15	91	4	2	14	6	1	336	UL	300	30000	13.57	208416	
p_t	x_ijt	q_it	and_so_on
0.01	-1
570.01	0	0	4	26	3	18	12	19	2	21	11	66	1	8	9	46	7	30	8	60	10	42	0	0	-1
0.01	-1
0.01	0	0	3	6	5	18	6	22	11	44	1	0	2	14	14	24	8	40	12	17	13	21	10	28	0	0	-1
0.01	-1
0.01	-1