Reducing Cycle Time at an IBM Wafer Fabrication Facility

Published Online:https://doi.org/10.1287/inte.26.2.34

In 1991, IBM San Jose decided to produce and sell magnetic heads for computer disk drives on the open market to original equipment manufacturers. However, as IBM's wafer fabrication facility increased the number of products it manufactured, its manufacturing cycle time lengthened. Since cycle time is important in competing in the open market, IBM San Jose formed a study team (in cooperation with UCLA) to examine the wafer fab and to develop ways to reduce cycle time. The team designed a new production control system and proposed new performance measures for operators and engineers. IBM implemented the new production control system and established the performance measures in June 1992, and the cycle time decreased by 50 percent by the end of 1992.

INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.