Minimizing Mean Squared Deviation of Completion Times About a Common Due Date

Published Online:https://doi.org/10.1287/mnsc.33.7.894

This paper addresses a nonpreemptive single machine scheduling problem where all jobs have a common due date and have zero ready time. The scheduling objective is to minimize mean squared deviation (MSD) of job completion times about the due date. This nonregular measure of performance is appropriate when earliness and tardiness are both penalized, and when large deviations of completion time from the due date are undesirable. A special case of the MSD problem, referred to as the unconstrained MSD problem, is shown to be equivalent to the completion time variance problem (CTV) studied by Merten and Muller (Merten, A. G., M. E. Muller. 1972. Variance minimization in single machine sequencing problems. Management Sci.18(September) 518–528.) and Schrage (Schrage, L. 1975. Minimizing the time-in-system variance for a finite jobset. Management Sci.21(May) 540–543.). Strong results for this latter problem are combined with several new propositions to develop a reasonably efficient procedure for solving the unconstrained MSD problem. This enables us to improve the existing procedures for the CTV problem. We also propose a branching procedure for the constrained MSD problem and present computational results.

INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.