Letter to the Editor—Timing of Check Out Before a Critical Event

Published Online:https://doi.org/10.1287/opre.13.6.1036

A system with constant failure rate must be operable at time T. Prior to this we permit only one check-out, and one repair if necessary. How far should we “back off” from T in scheduling check out? Approximate solutions are derived for exponential and log normal repair time distributions, with graphical results in the latter case.

INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.