Interblock Crane Deployment in Container Terminals

Published Online:https://doi.org/10.1287/trsc.36.1.79.568

We consider the problem of scheduling the movements of cranes in a container storage yard so as to minimize the total unfinished workload at the end of each time period. The problem is formulated as a mixed-integer linear program, and the computational complexity ofthe problem is analyzed. A Lagrangian decomposition solution procedure is described. A new solution approach, called the successive piecewise-linear approximation method, is also developed. Through computational experiments, we show that our proposed solution methods are both efficient and effective for large-sized problems.