Scheduling the Use of Water Power

Published Online:https://doi.org/10.1287/mnsc.5.2.179

A particular type of inventory model, a hydroelectric model, with a linear cost structure is studied. The form of the optimal water utilization policy for a hydroelectric installation (at which the assumptions of the model are satisfied) is described. The nature of the optimal policy if the cost function is convex is indicated. The optimal policy if future river flow is known is also indicated.

INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.