Corrigendum: Greed Works—Online Algorithms for Unrelated Machine Stochastic Scheduling

Published Online:https://doi.org/10.1287/moor.2021.1149

This corrigendum fixes an incorrect claim in the paper Gupta et al. [Gupta V, Moseley B, Uetz M, Xie Q (2020) Greed works—online algorithms for unrelated machine stochastic scheduling. Math. Oper. Res. 45(2):497–516.], which led us to claim a performance guarantee of 6 for a greedy algorithm for deterministic online scheduling with release times on unrelated machines. The result is based on an upper bound on the increase of the objective function value when adding an additional job j to a machine i (Gupta et al., lemma 6). It was pointed out by Sven Jäger from Technische Universität Berlin that this upper bound may fail to hold. We here present a modified greedy algorithm and analysis, which leads to a performance guarantee of 7.216 instead. Correspondingly, also the claimed performance guarantee of (6+3Δ)h(Δ) in theorem 4 of Gupta et al. for the stochastic online problem has to be corrected. We obtain a performance bound (7.216+3.608Δ)h(Δ).

INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.