On Scheduling with Ready Times and Due Dates to Minimize Maximum Lateness

Published Online:https://doi.org/10.1287/opre.23.3.475

An algorithm is developed for sequencing jobs on a single processor in order to minimize maximum lateness, subject to ready times and due dates. The method that we develop could be classified as branch-and-bound. However, it has the unusual feature that a complete solution is associated with each node of the enumeration tree.