The “Hub” and “Wheel” Scheduling Problems

I. The “Hub” Scheduling Problem: The Myopic Case
Published Online:https://doi.org/10.1287/trsc.11.2.124

The problem is that of scheduling truck movement (loaded and empty) between a central depot (the hub) and a number of outlying cities. Current demand is known deterministically, but future demand is uncertain. The myopic case treats two periods only: the current period and one future period. The objective is to minimize the expected total operating penalty, consisting of the costs of moving empties and the costs of delaying shipments. In two special cases the procedures of solution reduce to simple marginal analysis that has been previously solved by Minas and Mitten. In the general case, a network flow model is proposed that is easily solved.

INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.