A Branch-and-Cut Approach for a Generic Multiple-Product, Assembly-System Design Problem

Published Online:https://doi.org/10.1287/ijoc.1020.0025

References

  • Ammons J. C., Lofgren C. B., McGinnis L. F. A large scale machine loading problem in flexible assembly. Ann. Oper. Res. (1985) 3:319–332CrossrefGoogle Scholar
  • Assche F. V., Herroelen W. S. An optimal procedure for the single model deterministic assembly line balancing problems. Eur. J. Oper. Res. (1979) 3:142–149CrossrefGoogle Scholar
  • Baybars I. A survey of exact algorithms for the assembly line balancing problem. Management Sci. (1986) 32:909–932LinkGoogle Scholar
  • Bazaraa M. S., Jarvis J. J., Sherali H. D.Linear Programming and Network Flows (1990) 2nd ed.(John Wiley & Sons, New York) Google Scholar
  • Chakravarty A. K., Shtub A., Kusiak A. Integration of assembly robots in a flexible assembly system. Flexible Manufacturing Systems: Methods and Studies (1986) (Elsevier, Amsterdam, The Netherlands) 71–88Google Scholar
  • Chaudhuri S., Walker R. A., Mitchell J. Analyzing and exploiting the structure of the constraints in the ILP approach to the scheduling problem. IEEE Trans. VLSI Systems (1994) 2:456–471CrossrefGoogle Scholar
  • Donohue P. J., Fisher G. J., Stauffer R. J. Automated assembly of complex airframe structures. SAWE Paper 1981 (1991) (International Society of Allied Weight Engineers, Inc., Los Angeles, CA) Google Scholar
  • Gadidov R., Wilhelm W. E. A cutting plane approach for the single-product assembly system design problem. Internat. J. Production Res. (2000) 8:1731–1754CrossrefGoogle Scholar
  • Ghosh S., Gagnon R. J. A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. Internat. J. Production Res. (1989) 27:637–670CrossrefGoogle Scholar
  • Graves S. C., Lamar B. W. An integer programming procedure for assembly system design problems. Oper. Res. (1983) 31:522–545LinkGoogle Scholar
  • Graves S. C., Redfield C. H. Equipment selection and task assignment for multiproduct assembly system design. Internat. J. Flexible Manufacturing Systems (1988) 1:31–50CrossrefGoogle Scholar
  • Hackman S. T., Magazine M. J., Wee T. S. Fast, effective algorithms for simple assembly line balancing problems. Oper. Res. (1989) 37:916–924LinkGoogle Scholar
  • Hoffmann T. R. Eureka: A hybrid system for assembly line balancing. Management Sci. (1992) 38:39–47LinkGoogle Scholar
  • Huber J. Technology requirements to support aerospace plant modernization. Proc. Ann. Internat. Industrial Engrg. Conf. (1984) Institute of Industrial Engineers, Norcross, GA:262–270Google Scholar
  • IBMOptimization Subroutine Library: Guide and Reference, Release 2.1 (1995) (IBM Corporation, Poughkeepsie, NY) Google Scholar
  • Johnson R. V. Optimally balancing large assembly lines with “Fable”. Management Sci. (1988) 34:240–253LinkGoogle Scholar
  • Kim H., Park S. Strong cutting plane algorithms for the robotic assembly line balancing problem. Internat. J. Production Res. (1995) 33:2311–2323CrossrefGoogle Scholar
  • Kimms A. Minimal investment budgets for flow line configuration. (1998) . Working paper 470, Lehrstuhl für Produktion und Logistik, Institut für Betriebswirtschaftslehre, Christian-Albrechts Universität zu Kiel, Kiel, GermanyGoogle Scholar
  • Kuroda M., Tozato H. Mathematical model for designing hybrid assembly systems. Proc. IXth Internat. Conf. Production Res. (1987) (Cincinnati, OH)2139–2145Google Scholar
  • Lee H. F., Johnson R. V. A line-balancing strategy for designing flexible assembly systems. Internat. J. Flexible Manufacturing Systems (1991) 3:91–120CrossrefGoogle Scholar
  • McCaskill J. L. C. Production-line balances for mixed-model lines. Management Sci. (1972) 19:423–434LinkGoogle Scholar
  • Nemhauser G. L., Wolsey L. A.Integer and Combinatorial Optimization (1988) (John Wiley & Sons, New York) CrossrefGoogle Scholar
  • Nof S. Y., Wilhelm W. E., Warnecke H. J.Industrial Assembly (1997) (Chapman and Hall, London, U.K) CrossrefGoogle Scholar
  • Parija G. R., Gadidov R., Wilhelm W. E. A facet generation procedure for solving 0/1 integer programs. Oper. Res. (1999) 47:789–791LinkGoogle Scholar
  • Peters B. A. Strategic design of flexible assembly systems. (1991) . Ph.D. thesis, School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta, GAGoogle Scholar
  • Pinnoi A., Wilhelm W. E. A family of hierarchical models for the assembly system design. Internat. J. Production Res. (1997a) 35:253–280CrossrefGoogle Scholar
  • Pinnoi A., Wilhelm W. E. A branch-and-cut approach for workload smoothing on assembly lines. ORSA J. Comput. (1997b) 9:335–350LinkGoogle Scholar
  • Pinnoi A., Wilhelm W. E. Assembly system design: A branch-and-cut approach. Management Sci. (1998) 44:103–118LinkGoogle Scholar
  • Pinto P. A., Dannenbring D. G., Khumawala B. M. Assembly line balancing with processing alternatives: An application. Management Sci. (1983) 29:817–830LinkGoogle Scholar
  • Scholl A.Balancing and Sequencing of Assembly Lines (1995) (Physica Verlag, Heidelberg, Germany) CrossrefGoogle Scholar
  • Scholl A., Klein R. SALOME: A bidirectional branch-and-bound procedure for assembly line balancing. INFORMS J. Comput. (1997) 9:319–334LinkGoogle Scholar
  • Stecke K. Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems. Management Sci. (1983) 29:273–288LinkGoogle Scholar
  • Ugurdag H. F., Rachamadugu R., Papachristou C. A. Designing paced assembly lines with a fixed number of stations. Eur. J. Oper. Res. (1997) 102:488–501CrossrefGoogle Scholar
  • Wilhelm W. E. A column generation approach for the assembly system design problem with tool changes. Internat. J. Flexible Manufacturing Systems (1999) 11:177–205CrossrefGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.