A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem

Published Online:https://doi.org/10.1287/ijoc.1040.0121

References

  • Balas E., Lenstra J. K., Vazacopoulos A. The one-machine problem with delayed precedence constraints and its use in job shop scheduling. Management Sci. (1995) 41:94–109LinkGoogle Scholar
  • Bard J. F., Kontoravdis G., Yu G. A branch-and-cut procedure for the vehicle routing problem with time windows. Transportation Sci. (2002) 36:250–269LinkGoogle Scholar
  • Bartusch M., Möhring R. H., Radermacher E. J. Scheduling project networks with resource constraints and time windows. Ann. Oper. Res. (1988) 16:201–240CrossrefGoogle Scholar
  • Böttcher J., Drexl A., Kolisch R., Salewski F. Project scheduling under partially renewable resource constraints. Management Sci. (1999) 45:543–559LinkGoogle Scholar
  • Brucker P., Knust S., Schoo A., Thiele O. A branch and bound algorithm for the resource-constrained project scheduling problem. Eur. J. Oper. Res. (1998) 107:272–288CrossrefGoogle Scholar
  • De Reyck B., Herroelen W. On the use of the complexity index as a measure of complexity in activity networks. Eur. J. Oper. Res. (1996) 91:347–366CrossrefGoogle Scholar
  • De Reyck B., Herroelen W. A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations. Eur. J. Oper. Res. (1998) 111:152–174CrossrefGoogle Scholar
  • Dorndorf U., Pesch E., Phan-Huy T. A time-oriented branch-and-bound algorithm for resource-constrained project scheduling with generalised precedence constraints. Management Sci. (2000) 46:1365–1384LinkGoogle Scholar
  • Fischetti M., Lodi A. Local branching. Math. Programming (2003) 98:23–47CrossrefGoogle Scholar
  • Gu Z., Nemhauser G. L., Savelsbergh M. W. Lifted cover inequalities for 0-1 integer programs: Computation. INFORMS J. Comput. (1998) 10:427–437LinkGoogle Scholar
  • Gu Z., Nemhauser G. L., Savelsbergh M. W. Lifted cover inequalities for 0-1 integer programs: Complexity. INFORMS J. Comput. (1999) 11:117–123LinkGoogle Scholar
  • Hartmann S. Project scheduling under limited resources. Lecture Notes in Economics and Mathematical Systems (1999) Vol. 478(Springer, Berlin, Germany) CrossrefGoogle Scholar
  • Herroelen W., De Reyck B., Demeulemeester E. Resource-constrained project scheduling: A survey of recent developments. Comput. Oper. Res. (1998) 25:279–302CrossrefGoogle Scholar
  • Icmeli O., Rom W. O. Solving the resource constrained project scheduling problem with optimization subroutine library. Comput. Oper. Res. (1996) 23:801–817CrossrefGoogle Scholar
  • ILOGILOG CPLEX 7.5, Reference Manual (2002) (ILOG, Inc., Mountain View, CA) Google Scholar
  • Kilby P., Prosser P., Shaw P. A comparison of traditional and constraint-based heuristic methods on vehicle routing problems with side constraints. Constraints (1998) 5:389–414CrossrefGoogle Scholar
  • Klein R., Scholl A. Progress: Optimally solving the generalized resource-constrained project scheduling problem. Math. Methods Oper. Res. (2000) 52:467–488CrossrefGoogle Scholar
  • Kolisch R., Padman R. An integrated survey of deterministic project scheduling. OMEGA (2001) 29:249–272CrossrefGoogle Scholar
  • Kolisch R., Sprecher A., Drexl A. Characterization and generation of a general class of resource-constrained project scheduling problems. Management Sci. (1995) 41:1693–1703LinkGoogle Scholar
  • Mingozzi A., Maniezzo V., Ricciardelli S., Bianco L. An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation. Management Sci. (1998) 44:714–729LinkGoogle Scholar
  • Neumann K., Schwindt C., Zimmermann J. Project scheduling with time windows and scarce resources: Temporal and resource constrained project scheduling with regular and non-regular objective functions. Lecture Notes in Economics and Mathematical Systems (2002) Vol. 508(Springer, Berlin, Germany) Google Scholar
  • Nonobe K., Ibaraki T., Ribeiro C. C., Hansen P. Formulation and tabu search algorithm for the resource constrained project scheduling problem. Essays and Surveys in Metaheuristics (2002) (Kluwer Academic Publishers, Boston, MA) 557–588CrossrefGoogle Scholar
  • Özdamar L., Ulusoy G. A survey on resource-constrained project scheduling problem. IIE Trans. (1995) 27:574–586CrossrefGoogle Scholar
  • Pritsker A. A. B., Watters L. J., Wolfe P. M. Multiproject scheduling with limited resources: A zero-one programming approach. Management Sci. (1969) 16:93–108LinkGoogle Scholar
  • Sprecher A., Drexl A. Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm. Eur. J. Oper. Res. (1998) 107:431–450CrossrefGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.