Assembly-Line Scheduling with Concurrent Operations and Parallel Machines
Published Online:1 Feb 2002https://doi.org/10.1287/ijoc.14.1.68.7708
References
- Component fixture positioning/sequencing for printed circuit board assembly with concurrent operations. Operations Research (1995) 43:444–457Link, Google Scholar
- Integrated production scheduling in large-scale flexible electronic parts manufacturing. Annals of Operations Research (1988) 15:269–287Crossref, Google Scholar
- Component allocation and partitioning for a dual delivery placement machine. Operations Research (1988) 36:176–191Link, Google Scholar
- Staging problem of a dual delivery pick-and-place machine in printed circuit card assembly. Operations Research (1994) 42:81–91Link, Google Scholar
- The line segmentation problem. Operations Research (1991) 39:42–55Link, Google Scholar
- Sequencing of insertions in printed circuit board assembly. Operations Research (1988) 36:192–201Link, Google Scholar
- A vector-sum theorem and its application to improving flow shop guarantees. Mathematics of Operations Research (1981) 6:445–452Link, Google Scholar
- , Du D-Z., Sun J. Scheduling multiprocessor flow shops. New Advances in Optimization and Approximation (1994) (Kluwer, Dordrecht, The Netherlands) 1–8Crossref, Google Scholar
- The complexity of flowshop and jobshop scheduling. Mathematics of Operations Research (1976) 1:117–129Link, Google Scholar
- Bounds for certain multiprocessing anomalies. Bell System Tech. Journal (1966) 45:1563–1581Crossref, Google Scholar
- Preemptive scheduling in a two-stage multiprocessor flow shop is NPhard. European Journal of Operational Research (1996) 89:172–175Crossref, Google Scholar
- Concurrent flowshop scheduling. (2000) . Working Paper, Department of Decision Sciences and Information Systems, Florida International University, Miami, FLGoogle Scholar
- Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. Management Science (1993) 39:616–625Link, Google Scholar
- Minimizing makespan in hybrid flowshops. Operations Research Letters (1994) 16:149–158Crossref, Google Scholar
- Sequencing in an assembly line with blocking to minimize cycle time. Operations Research (1989) 37:925–935Link, Google Scholar
- The two-stage assembly scheduling problem: complexity and approximation. Operations Research (1995) 43:346–355Link, Google Scholar
- On compact vector summation. Diskretnaya Matematika (1991) 3:66–72in RussianGoogle Scholar
- On some geometric methods in scheduling theory: a survey. Discrete Applied Mathematics (1994) 55:59–82Crossref, Google Scholar
- Vector summation in Banach space and polynomial algorithms for flow shops and open shops. Mathematics of Operations Research (1995) 20:90–103Link, Google Scholar

