Efficient Project Scheduling with Autonomous Learning Opportunities

Published Online:https://doi.org/10.1287/ijoc.2023.0107

References

  • Ahuja RK, Magnanti TL, Orlin JB (1988) Network Flows (Pearson, London).CrossrefGoogle Scholar
  • Artigues C (2017) On the strength of time-indexed formulations for the resource-constrained project scheduling problem. Oper. Res. Lett. 45(2):154–159.CrossrefGoogle Scholar
  • Babu A, Suresh N (1996) Project management with time, cost, and quality considerations. Eur. J. Oper. Res. 88(2):320–327.CrossrefGoogle Scholar
  • Bai D, Tang M, Zhang ZH, Santibanez-Gonzalez ED (2018) Flow shop learning effect scheduling problem with release dates. Omega 78:21–38.CrossrefGoogle Scholar
  • Biskup D (2008) A state-of-the-art review on scheduling with learning effects. Eur. J. Oper. Res. 188(2):315–329.CrossrefGoogle Scholar
  • Cao H, Hall NG, Wan G, Zhao W (2024) Optimal intraproject learning. Manufacturing Service Oper. Management 26(2):681–700.LinkGoogle Scholar
  • De Reyck B, Herroelen W (1999) The multi-mode resource-constrained project scheduling problem with generalized precedence relations. Eur. J. Oper. Res. 119(2):538–556.CrossrefGoogle Scholar
  • Dodin B, Elimam A (1997) Audit scheduling with overlapping activities and sequence-dependent setup costs. Eur. J. Oper. Res. 97(1):22–33.CrossrefGoogle Scholar
  • Ebbinghaus H (1885) Über das Gedächtnis. Untersuchungen zur experimentellen Psychologie (Duncker & Humblot, Leipzig, Germany).Google Scholar
  • Elmaghraby SE, Kamburowski J (1992) The analysis of activity networks under generalized precedence relations (GPRs). Management Sci. 38(9):1245–1263.LinkGoogle Scholar
  • Glock CH, Grosse EH, Jaber MY, Smunt TL (2019) Applications of learning curves in production and operations management: A systematic literature review. Comput. Indust. Engrg. 131:422–441.CrossrefGoogle Scholar
  • Hall NG (2012) Project management: Recent developments and research opportunities. J. Systems Sci. Systems Engrg. 21(2):129–143.CrossrefGoogle Scholar
  • Hartmann S, Briskorn D (2010) A survey of variants and extensions of the resource-constrained project scheduling problem. Eur. J. Oper. Res. 207(1):1–14.CrossrefGoogle Scholar
  • Hartmann S, Briskorn D (2022) An updated survey of variants and extensions of the resource-constrained project scheduling problem. Eur. J. Oper. Res. 297(1):1–14.CrossrefGoogle Scholar
  • Heuser P, Letmathe P, Vossen TW (2024) Skill development in the field of scheduling: A structured literature review. Eur. J. Oper. Res. Forthcoming.Google Scholar
  • Hill A, Ticktin J, Vossen TWM (2021) A computational study of constraint programming approaches for resource-constrained project scheduling with autonomous learning effects. Stuckey PJ, ed. Integration of Constraint Programming Artificial Intelligence Oper. Res. 18th Internat. Conf. CPAIOR 2021 Proc., Lecture Notes in Computer Science, vol. 12735 (Springer, Cham, Switzerland), 26–44.Google Scholar
  • Hochbaum DS (2016) A polynomial time repeated cuts algorithm for the time cost tradeoff problem: The linear and convex crashing cost deadline problem. Comput. Indust. Engrg. 95:64–71.CrossrefGoogle Scholar
  • Johnson TJR (1967) An algorithm for the resource constrained project scheduling problem. PhD thesis, Massachusetts Institute of Technology, Cambridge, MA.Google Scholar
  • Kelley JE Jr (1961) Critical-path planning and scheduling: Mathematical basis. Oper. Res. 9(3):296–320.LinkGoogle Scholar
  • Kolisch R, Sprecher A (1997) PSPLIB—A project scheduling problem library: OR software—ORSEP operations research software exchange program. Eur. J. Oper. Res. 96(1):205–216.CrossrefGoogle Scholar
  • Korytkowski P, Malachowski B (2019) Competence-based estimation of activity duration in IT projects. Eur. J. Oper. Res. 275(2):708–720.CrossrefGoogle Scholar
  • Laborie P, Rogerie J, Shaw P, Vilím P (2018) IBM ILOG CP Optimizer for scheduling. Constraints 23(2):210–250.CrossrefGoogle Scholar
  • Lee WC, Wu CC, Hsu PH (2010) A single-machine learning effect scheduling problem with release times. Omega 38(1–2):3–11.CrossrefGoogle Scholar
  • Möhring RH, Skutella M, Stork F (2004) Scheduling with and/or precedence constraints. SIAM J. Comput. 33(2):393–415.CrossrefGoogle Scholar
  • Möhring RH, Schulz AS, Stork F, Uetz M (1999) Resource-constrained project scheduling: Computing lower bounds by solving minimum cut problems. Eur. Sympos. Algorithms ESA ‘99, Lecture Notes in Computer Science, vol. 1643 (Springer, Berlin, Heidelberg), 139–150.Google Scholar
  • Pritsker AAB, Waiters LJ, Wolfe PM (1969) Multiproject scheduling with limited resources: A zero-one programming approach. Management Sci. 16(1):93–108.LinkGoogle Scholar
  • Qian J, Steiner G (2013) Fast algorithms for scheduling with learning effects and time-dependent processing times on a single machine. Eur. J. Oper. Res. 225(3):547–551.CrossrefGoogle Scholar
  • Reyck BD, Demeulemeester E, Herroelen W (1999) Algorithms for scheduling projects with generalized precedence relations. Węglarz J, ed. Project Scheduling, International Series in Operations Research and Management Science, vol. 14 (Springer, Boston), 77–105.CrossrefGoogle Scholar
  • Schwindt C, Zimmermann J, eds. (2015) Handbook on Project Management and Scheduling (Springer, Cham, Switzerland).CrossrefGoogle Scholar
  • Van Peteghem V, Vanhoucke M (2015) Influence of learning in resource-constrained project scheduling. Comput. Indust. Engrg. 87:569–579.CrossrefGoogle Scholar
  • Vanhoucke M (2008) Setup times and fast tracking in resource-constrained project scheduling. Comput. Indust. Engrg. 54(4):1062–1070.CrossrefGoogle Scholar
  • Vanhoucke M, Debels D (2008) The impact of various activity assumptions on the lead time and resource utilization of resource-constrained projects. Comput. Indust. Engrg. 54(1):140–154.CrossrefGoogle Scholar
  • Wright TP (1936) Factors affecting the cost of airplanes. J. Aeronaut. Sci. 3(4):122–128.CrossrefGoogle Scholar
  • Yelle LE (1979) The learning curve: Historical review and comprehensive survey. Decision Sci. 10(2):302–328.CrossrefGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.