Note from the Editor
Published Online:27 Jun 2023https://doi.org/10.1287/ijoc.2023.ed.v35.n4
References
- (1985) An integer programming approach to reference staff scheduling. Inform. Process Management 21:459–464.Crossref, Google Scholar
- (1987) Asset divestiture at Homart Development Co. Interfaces 17:48–64.Link, Google Scholar
- (1981) The affair between the land developer and the management scientist. Interfaces 11:50–56.Link, Google Scholar
- (1990) Selecting tenants in a shopping mall. Interfaces, 18:1–9. Render B, Stair R, Greenberg I, eds. Feature article. Reprinted in Cases and Readings in Management Science (Allyn & Bacon, Boston), 1–9.Google Scholar
- (1997) A genetic algorithm for the multiple-choice integer program. Oper. Res. 45:92–101.Link, Google Scholar
- (1999) A hybrid genetic/optimization algorithm for a task allocation problem. J. Sched. 2:189–201.Crossref, Google Scholar
- (1991) A Lagrangian based approach to the asymmetric generalized traveling salesman problem. Oper. Res. 39:623–632.Link, Google Scholar
- (1999) A genetic algorithm methodology for complex scheduling problems. Naval Res. Logist. 46:199–211.Crossref, Google Scholar
- (2000) Scheduling operations on parallel machine tools. IIE Trans. 32:449–459.Crossref, Google Scholar
- (2016) Scheduling parallel-machine batch operations to maximize on-time delivery performance. J. Sched. 19:583–600.Crossref, Google Scholar

