The New Dutch Timetable: The OR Revolution

Published Online:https://doi.org/10.1287/inte.1080.0409

References

  • Abbink E., Van't Wout J., Huisman D. Solving large scale crew scheduling problems by using iterative partitioning. (2007) . Retrieved September 9, 2008, http://drops.dagstuhl.de/opus/volltexte/2007/1168/pdf/07001.AbbinkErwin.Paper.1168.pdfGoogle Scholar
  • Abbink E., Fischetti M., Kroon L. G., Timmer G., Vromans M. J. C. M. Reinventing crew scheduling at Netherlands Railways. Interfaces (2005) 35(5):393–401LinkGoogle Scholar
  • Caprara A., Fischetti M., Toth P. A heuristic algorithm for the set covering problem. Oper. Res. (1999) 47(6):730–743LinkGoogle Scholar
  • Caprara A., Kroon L. G., Monaci M., Peeters M., Toth P., Barnhart C., Laporte G. Passenger railway optimization. Transportation (2007) (Elsevier, Amsterdam) 129–187CrossrefGoogle Scholar
  • Fioole P.-J., Kroon L. G., Maróti G., Schrijver A. A rolling stock circulation model for combining and splitting of passenger trains. Eur. J. Oper. Res. (2006) 174(2):1281–1297CrossrefGoogle Scholar
  • Hooghiemstra J. S., Kroon L. G., Odijk M. A., Salomon M., Zwaneveld P. J. Decision support systems support the search for “win-win” solutions in railway network design. Interfaces (1999) 29(2):15–32LinkGoogle Scholar
  • Huisman D., Kroon L. G., Lentink R. M., Vromans M. J. C. M. Operations research in passenger railway transportation. Statistica Neerlandica (2005) 59(4):467–497CrossrefGoogle Scholar
  • International Union of Railways (UIC)International Railway Statistics 2005 (2007) (UIC, Paris) Google Scholar
  • Kroon L. G., Fischetti M., Voß S., Daduna J. R. Crew scheduling for Netherlands Railways “Destination: Customer”. Computer-Aided Scheduling of Public Transport (2001) (Springer, Berlin) 181–201CrossrefGoogle Scholar
  • Middelkoop D., Bouwman M., Peters B., Smith J. SIMONE: Large scale train network simulations. Proc. 2001 Winter Simulation Conf. (2001) Institute of Electrical and Electronic Engineers PressPiscataway, NJ:1042–1047CrossrefGoogle Scholar
  • Morgado E. M., Martins J. P. CREWS_NS: Scheduling train crews in The Netherlands. AI Magazine (1998) 19(1):25–38Google Scholar
  • Nederlandse Spoorwegen (Netherland Railways—NS) (2008) . Retrieved September 9, 2008, http://www.ns.nl/cs/Satellite/ns2007/nl/artikel/include/1198251860645/energie+en+klimaat?p=1160724828590Google Scholar
  • Schrijver A., Steenbeek A. Spoorweg Dienstregelingont-wikkeling (Railway timetable development). (1993) . Retrieved September 9, 2008, http://homepages.cwi.nl/∼lex/files/rapp1a.pdfGoogle Scholar
  • Serafini P., Ukovich W. A mathematical model for periodic event scheduling problems. SIAM J. Discrete Math. (1989) 2(4):550–581CrossrefGoogle Scholar
  • Zwaneveld P. J., Kroon L. G., Van Hoesel C. P. M. Routing trains through a railway station based on a node packing model. Eur. J. Oper. Res. (2001) 128(1):14–33CrossrefGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.