Improving Workforce Scheduling of Aircraft Line Maintenance at Sabena Technics
References
- (1999) Aircraft maintenance workforce scheduling: A case study. J. Quality Maintenance Engrg. 5(2) 78–88.Crossref, Google Scholar
- (2007) A simulation approach for stochastic employee days-off scheduling. Internat. J. Model. Simulation 27(1) 9–15.Google Scholar
- (2004) Airline schedule planning: Accomplishments and opportunities. Manufacturing Service Oper. Management 6(1) 3–22.Link, Google Scholar
- (2010) Integrated staffing and scheduling for an aircraft line maintenance problem. . Technical report, research paper 2010/23, Hogeschool Universiteit Brussel, Brussels, Belgium.Google Scholar
- (2004) The state of the art of nurse rostering. J. Scheduling 7(6) 441–499.Crossref, Google Scholar
- (2001) Optimized crew scheduling at Air New Zealand. Interfaces 31(1) 30–56.Link, Google Scholar
- (2000) Air Transat uses ALTITUDE to manage its aircraft routing, crew pairing, and work assignment. Interfaces 30(2) 41–53.Link, Google Scholar
- (2004) Scheduling and rostering: A review of applications, methods, and models. Eur. J. Oper. Res. 153(1) 3–27.Crossref, Google Scholar
- (2000) Dynamic workforce scheduling for British Telecommunications plc. Interfaces 30(1) 45–56.Link, Google Scholar
- (2003) A new era for crew recovery at Continental Airlines. Interfaces 33(1) 5–22.Link, Google Scholar

