IBM Blends Heuristics and Optimization to Plan Its Semiconductor Supply Chain
References
- . (2010) Queueing model improves IBM’s semiconductor capacity and lead-time management. Interfaces 40(5):397–407.Link, Google Scholar
- . (2006) IBM solves a mixed-integer program to optimize its semiconductor supply chain. Interfaces 36(5):386–399.Link, Google Scholar
- . (2003) Method of calculating low level codes for considering capacities. . US Patent 6,584,370, filed May 14, 1990, issued March 23, 1993.Google Scholar
- . (2001) An extended enterprise planning methodology for the discrete manufacturing industry. Eur. J. Oper. Res. 129(2):317–325.Crossref, Google Scholar
- . (1999) A hierarchical Lagrangean relaxation procedure for solving midterm planning problems. Indust. Engrg. Chemistry Res. 38(6):1937–1947.Crossref, Google Scholar
- . (2004) Decomposition system and method for solving a large-scale semiconductor production planning problem. . US Patent 6,701,201, filed August 22, 2001, issued March 2, 2004.Google Scholar
- . (1996) IMPReSS: An automated production-planning and delivery-quotation system at Harris Corporation—Semiconductor Sector. Interfaces 26(1):6–37.Link, Google Scholar
- . (2006) Supply chain model for the semiconductor industry in consideration of manufacturing characteristics. Production Planning Control 17(5):518–533.Crossref, Google Scholar
- . (2000) Extended-enterprise supply-chain management at IBM Personal Systems Group and other divisions. Interfaces 30(1):7–25.Link, Google Scholar
- . (2001) Matching assets with demand in supply-chain management at IBM Microelectronics. Interfaces 31(1):108–124.Link, Google Scholar
- . (2011) A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations. J. Scheduling 14(6):583–589.Crossref, Google Scholar
- . (1990) IBM Burlington’s logistics management system. Interfaces 20(1):43–64.Link, Google Scholar
- . (2006) Capacity planning with reconfigurable kits in semiconductor test manufacturing. Internat. J. Production Res. 44(13):2625–2644.Crossref, Google Scholar
- . (2007) Hierarchical capacity planning with reconfigurable kits in global semiconductor assembly and test manufacturing. IEEE Trans. Automation Sci. Engrg. 4(4):543–552.Crossref, Google Scholar

