IBM Blends Heuristics and Optimization to Plan Its Semiconductor Supply Chain

Published Online:https://doi.org/10.1287/inte.1120.0642

References

  • Brown SM, Hanschke T, Meents I, Wheeler BR, Zisgen H. (2010) Queueing model improves IBM’s semiconductor capacity and lead-time management. Interfaces 40(5):397–407.LinkGoogle Scholar
  • Denton B, Forrest J, Milne RJ. (2006) IBM solves a mixed-integer program to optimize its semiconductor supply chain. Interfaces 36(5):386–399.LinkGoogle Scholar
  • Denton BT, Hegde SR, Orzell RA. (2003) Method of calculating low level codes for considering capacities. . US Patent 6,584,370, filed May 14, 1990, issued March 23, 1993.Google Scholar
  • Frederix F. (2001) An extended enterprise planning methodology for the discrete manufacturing industry. Eur. J. Oper. Res. 129(2):317–325.CrossrefGoogle Scholar
  • Gupta A, Maranas CD. (1999) A hierarchical Lagrangean relaxation procedure for solving midterm planning problems. Indust. Engrg. Chemistry Res. 38(6):1937–1947.CrossrefGoogle Scholar
  • Hegde SR, Milne RJ, Orzell RA, Pati MC, Patil SP. (2004) Decomposition system and method for solving a large-scale semiconductor production planning problem. . US Patent 6,701,201, filed August 22, 2001, issued March 2, 2004.Google Scholar
  • Leachman RC, Benson RF, Liu C, Raar DJ. (1996) IMPReSS: An automated production-planning and delivery-quotation system at Harris Corporation—Semiconductor Sector. Interfaces 26(1):6–37.LinkGoogle Scholar
  • Lee YH, Chung S, Lee B, Kang KH. (2006) Supply chain model for the semiconductor industry in consideration of manufacturing characteristics. Production Planning Control 17(5):518–533.CrossrefGoogle Scholar
  • Lin G, Ettl M, Buckley S, Bagchi S, Yao DD, Naccarato BL, Allan R, Kim K, Koenig L. (2000) Extended-enterprise supply-chain management at IBM Personal Systems Group and other divisions. Interfaces 30(1):7–25.LinkGoogle Scholar
  • Lyon P, Milne RJ, Orzell R, Rice R. (2001) Matching assets with demand in supply-chain management at IBM Microelectronics. Interfaces 31(1):108–124.LinkGoogle Scholar
  • Monch L, Fowler JW, Dauzère-Pérès S, Mason SJ, Rose O. (2011) A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations. J. Scheduling 14(6):583–589.CrossrefGoogle Scholar
  • Sullivan G, Fordyce K. (1990) IBM Burlington’s logistics management system. Interfaces 20(1):43–64.LinkGoogle Scholar
  • Zhang Z, Zhang MT, Niu S, Zheng L. (2006) Capacity planning with reconfigurable kits in semiconductor test manufacturing. Internat. J. Production Res. 44(13):2625–2644.CrossrefGoogle Scholar
  • Zhang MT, Niu S, Deng S, Zhang Z, Li Q, Zheng L. (2007) Hierarchical capacity planning with reconfigurable kits in global semiconductor assembly and test manufacturing. IEEE Trans. Automation Sci. Engrg. 4(4):543–552.CrossrefGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.